US Army Awards Ameresco Energy Storage System Contract

May 9, 2022 by Dan McCue
US Army Awards Ameresco Energy Storage System Contract
(Photo courtesy Ameresco)

FREDERICK, Md. — The U.S. Army has awarded the Federal Solutions Group of Ameresco Inc. a contract to add a comprehensive battery storage system to the existing 18.6-MW solar energy facility at the Fort Detrick Army Garrison in Maryland.

Ameresco, a clean-tech integrator specializing in energy efficiency and renewable energy, will install the 6-MW battery on the 67-acre site in partnership with Defense Logistics Agency Energy.

Among other things, the new battery will ensure the balance of electricity supply and demand at all times across the system. In addition, it will be microgrid ready, allowing for future additions of resiliency equipment.

Best of all, from the Army’s perspective, the new battery is designed to provide guaranteed utility cost savings of $125,000 annually to the government.


(Photo courtesy Ameresco)

“We have been working with Ameresco to continually reduce our facilities’ fossil-fuel energy consumption and ensure greener environmental strategies for years to come,” said Garrison Commander Col. Danford Bryant in a written statement.

“This is a great project and an excellent example of collaboration to support both the Army and the community,” he added.


Ameresco’s relationship with the Fort Detrick Army Garrison dates back to 2015 when it was awarded a 26-year Renewable Energy Supply Agreement and site lease to design, build, finance, and operate and maintain the facility’s 18.6-MW-dc solar renewable energy generation system. 

The solar field, which includes 59,994 solar panels, nine central inverters and transformers, and medium-voltage overhead and underground electric distribution, was completed in 2016, one month ahead of schedule. It currently serves approximately 12% of Fort Detrick’s annual electric load requirements.

“We commend the Army for taking yet another step to improve their energy infrastructure through battery energy storage technologies at Fort Detrick,” said Nicole Bulgarino, executive vice president of Ameresco in a written statement. 

“This installation ties in the renewable energy generation from the existing solar arrays to a system that will allow the base to be microgrid-ready, ultimately creating a more resilient and future energy-ready base,” she said.


The project is expected to be completed in early 2023.

Dan can be reached at [email protected] and @DanMcCue

A+
a-

In The News

Health

Voting

Military

June 26, 2022
by Dan McCue
Army Selects Lockheed Martin for Long-Term Energy Storage Program

BETHESDA, Md. — The U.S. Army has selected Lockheed Martin to build the first megawatt-scale, long-duration energy storage system at... Read More

BETHESDA, Md. — The U.S. Army has selected Lockheed Martin to build the first megawatt-scale, long-duration energy storage system at Fort Carson in Colorado. The installation and its use as a demonstration project for the Department of Defense is being overseen by the U.S. Army Engineer... Read More

June 10, 2022
by Dan McCue
Army Deploys Largest Floating Solar Array in Southeast at Fort Bragg

FORT BRAGG, N.C. – The U.S. Army held a ribbon-cutting ceremony on Friday to celebrate the deployment of a floating... Read More

FORT BRAGG, N.C. – The U.S. Army held a ribbon-cutting ceremony on Friday to celebrate the deployment of a floating solar array that not only is a first of its kind for the Department of Defense, but is also the largest such system in the Southeast.... Read More

May 18, 2022
by Dan McCue
US Army Leading by Example on Climate Change Adaptation

WASHINGTON — Though its primary mission remains warfighting, the U.S. Army is playing a leading role in an entirely different... Read More

WASHINGTON — Though its primary mission remains warfighting, the U.S. Army is playing a leading role in an entirely different battle — the nation’s response to the challenges of climate change. The scope of this mission is laid out in the Army’s Climate Change Strategy, which... Read More

May 18, 2022
by Tom Ramstack
UFOs Described at Congressional Hearing as Potential National Security Threat

WASHINGTON — Defense intelligence officials told a congressional panel Tuesday that sightings of "unidentified aerial phenomena" are increasing but they... Read More

WASHINGTON — Defense intelligence officials told a congressional panel Tuesday that sightings of "unidentified aerial phenomena" are increasing but they could not explain why. They don’t know where they come from or how the ultra-fast flying discs stay in the air. Deputy Director of Naval Intelligence... Read More

May 13, 2022
by Tom Ramstack
Space is the Future for National Defense, Military Officials Tell Congressional Panel

WASHINGTON — Space was described as the final frontier for defending the United States against weapons of mass destruction from... Read More

WASHINGTON — Space was described as the final frontier for defending the United States against weapons of mass destruction from China and Russia at a congressional hearing Friday. Leading the U.S. defense effort is the Space Force, a new branch of the military that seeks to... Read More

May 9, 2022
by Dan McCue
US Army Awards Ameresco Energy Storage System Contract

FREDERICK, Md. — The U.S. Army has awarded the Federal Solutions Group of Ameresco Inc. a contract to add a... Read More

FREDERICK, Md. — The U.S. Army has awarded the Federal Solutions Group of Ameresco Inc. a contract to add a comprehensive battery storage system to the existing 18.6-MW solar energy facility at the Fort Detrick Army Garrison in Maryland. Ameresco, a clean-tech integrator specializing in energy... Read More

News From The Well
scroll top